Engine assembly order Before starting engine assembly, make sure available all necessary details, materials and tools to which number the following belongs: a) Standard set of the metalwork tool; b) A Dinamometrichesky natural a drive on 1/2-dyuymv; c) The tool for putting on of piston rings; d) The tool for a staving of piston rings; e) Short pieces of a fuel hose for putting on on hairpins of covers of shatunny bearings; f) Measuring set of Plastigage; g) Set щупов lezviyny type; h) A file with small tooth; i) Fresh impellent oil; j) Assembly impellent or greasing on the basis of a molybdenum disulphate; k) Prokladochny hermetic; l) Hermetic for fixing of carving connections. With a view of economy of time and minimization of volume of arising problems make engine assembly in the following order:
|
a) Shatunno-porshnevye assemblies (engines B18C1, В18С5, D16Y5, D16Y7 and D16Y8); b) Cranked shaft and radical bearings; c) A back epiploon of a cranked shaft with the holder; d) Shatunno-porshnevye assemblies (B18B1 engine); e) Maslootrazhatel of the case pallet; f) The oil pump with a maslozabornik; g) Case pallet; h) Head of cylinders; i) Camshaft (ы) and assembly of yokes; j) Water pump; k) A gas-distributing belt with cogwheels of a drive of GRM; l) Inlet pipeline and final collector; m) Sections of a forward cover; n) Cover of a head of cylinders; o) Flywheel / driving disk. |
|
|